News in detail
Successfully Load out of SRU module for PETROBRAS
Release time:
18 Aug,2011
On August 4th, 2011, SRU module which is built for PETROBRAS has been successfully delivered at BOMESC Lingang Quay,and because of the weight limitation, the loading way adopts floating crane. The weight for this module is 522 ton.
